1
View single post by Tsquare
 Posted: Fri Jul 3rd, 2020 12:05 pm
PM Quote Reply Full Topic
Tsquare



Joined: Fri Nov 10th, 2017
Location: Suwanee, Georgia USA
Posts: 1540
Status: 
Offline
Reputation: 
Reputation Points: $user_rep
Tsquare wrote:
The rental place wanted too much for two sets of scaffolds. I am replacing second floor windows and have maxed out my budget. I now have a motorized scaffold with a 400 pound limit. It is just the right height to take the security lamp off the wall in between the garage doors when I moved to the last window.

It is a good thing OSHA doesn't check residential areas. 



The windows are done. All tools have been put up and the ladder rack is over by the kayak in storage. I am glad to have the truck back to more than a mobile scaffold. BTW:  It worked but I do not want to do that again.

Rant on: The windows on the main floor are not a standard size. The windows on the front are 1 inch taller and they are the ones I measured for the special order windows. The windows in the picture I had to route out a half inch of wood at the top and bottom to get them to fit.  That caused other issues that had to be addressed. This should have been a simple remove and replace that took no more than 2 days and it has been a week and a half.



____________________
Tony
NE ATL
'04 XLT regular cab 3.slo stepside
Semi retirement