1
View single post by Scrambler82 | |||||||||
Posted: Sat Jun 20th, 2020 12:02 pm |
|
||||||||
Scrambler82 Old Bastard ! ![]() Joined: Fri Dec 22nd, 2017
Location: California USA
Posts: 2108
Status:
Offline
Reputation: ![]() ![]() ![]() ![]() ![]() ![]() Reputation Points: $user_rep
![]() |
Question, since the OEM Standard is Riveted Frame Rails, what is the best method of reconnecting the sections of the Frame IF you were to change things around ? Everyone will come up with Grade 8 or 10 Bolts, but if the connecting bolts are too hard that can cause problems too. Would you add additional plating along the connecting points, welded or bolted as the frame ? Just thinking out loud ! Ltr Last edited on Sat Jun 20th, 2020 12:03 pm by Scrambler82 ____________________ Ltr, 2003 EDGE, Std Cab, Steppie, E4 Red, 5sp, 4x 5" SuperLift, 33" x 12.50 x 15" Hurst Shifter Mod'd Backrack to fit Steppie Front and Rear Bumpers by Custom 4x4 Fabrication, OK; now Mike's Welding and Fabrication. Working on more Mods, just need more time, longer days would work ! |
||||||||
|