1
View single post by Scrambler82 | |||||||||
Posted: Tue Apr 16th, 2019 01:42 pm |
|
||||||||
Scrambler82 Old Bastard ! ![]() Joined: Fri Dec 22nd, 2017
Location: California USA
Posts: 2108
Status:
Offline
Reputation: ![]() ![]() ![]() ![]() ![]() ![]() Reputation Points: $user_rep
![]() |
My project for the day ! Find a piece of 1.5" aluminum round stock for my Projector Retrofit. Yesterday I did the following: ------------------------------------------ My latest adventure... The Projector Headlights ! I started by making a few measurements of the housing. Findings: 1) There isn't enough room in the housing to put the Projector in side ! Maybe 1/4" from the front of the lens but to me that is not enough. 2) The Bulb Opening, measures 1.345 ID ! 3) The reflector portion of the headlights and the parking lights, they are chromed and I am not sure how to get the chrome off so I can paint them black. I need to find a piece of aluminum round stock that measures 1.5", this will allow me to get it turned down to the 1.345" of the bulb Opening (Port), so I can use my Jig to drill the mounting holes and to open up the housing for the project or to fit from the rear. Find a machine shop to turn the aluminum down for me and put a center hole in the piece for a guide, sort of a datum hole, everything will be located from the center of the bulb opening. Everything... I mean the four holes to mount the projectors and the larger opening to put the Projector through. Now what was that temperature I needed to open up the housings ? LoL ! what next !
____________________ Ltr, 2003 EDGE, Std Cab, Steppie, E4 Red, 5sp, 4x 5" SuperLift, 33" x 12.50 x 15" Hurst Shifter Mod'd Backrack to fit Steppie Front and Rear Bumpers by Custom 4x4 Fabrication, OK; now Mike's Welding and Fabrication. Working on more Mods, just need more time, longer days would work ! |
||||||||
|