OK so now the Shop...  got all but three shop lights installed, the 4200K LEDs are not as bright as I had hoped...  the good thing is I purchased them from Costco, I can return them for full refund !  Gotta Luv Costco !

The air system is complete, six drops with air outlets, and additional one near the Drill Press and can be hooked up to add air for drilling when needed; and one more drop near the Welding Table/Plasma Cutting area... just for cutting. 

Welder/Plasma Cutter Electrical Outlet in place... great !

All I need is three more 120 volt outlet inside, two outside, and the three additional Automatic Lights for the outside and I could have been done but just recently rebuild two older Tools,  a 14" Delta Bandsaw and that is not running 220 VDC, variable, and a Craftsman 1" Belt Grinder.   The belt grinder had an 8" Dic on the side but that is gone and instead of the 1/3 HP, 120 VAC Motor, she now runs a 220 VAC 3/4 HP Motor... it should tear up some metal.

Pictures soon, just need to clean up things a little more.

Air done, Electrical almost done, Ranger going inside to check out the ABS Electrical Connections... I have one rear tire locking up early.
Forge is coated with a coating of UV Reflective Material... letting it dry for a few days, maybe four or five, then I can test for leaks with 50 lb. of air before running Propane to it !



____________________
Ltr,
2003 EDGE, Std Cab, Steppie, E4 Red, 5sp, 4x
5" SuperLift, 33" x 12.50 x 15"
Hurst Shifter
Mod'd Backrack to fit Steppie
Front and Rear Bumpers by Custom 4x4 Fabrication, OK; now Mike's Welding and Fabrication.
Working on more Mods, just need more time, longer days would work !